Report Moonshinedave · Registered Joined Mar 28, 2013 · 4,071 Posts Jan 18, 2015 Project is pretty much shut down for winter, these roof over hangs are only temporary to keep the snow and rain away from the doors, The plan is to add a metal working building on top of cellar with deck on the front side.
Project is pretty much shut down for winter, these roof over hangs are only temporary to keep the snow and rain away from the doors, The plan is to add a metal working building on top of cellar with deck on the front side.
Report